Project at a glance
Customer
Austin Hindu Temple
System Type
Commercial Solar
Mounting
Roof Mounted
PV Capacity
100.440 kW
Battery
None
EV Charger
4
The Challenge
Permanently solve their energy problems
Located at 9801 Decker Lake Road in Austin, Texas, the Austin Hindu Temple faces massive utility overhead to keep its expansive 13,960-square-foot facility climate controlled. To dramatically reduce overhead and take advantage of a rebate offered by their electric utility, management turned to Sunshine Renewable Solutions for a custom 100.44 kW DC roof-mounted solar-energy system.
10,000+
kWh / month consumed
Sunshine's Solution
A full service, design/build commercial solar system
Sunshine Renewable Solutions delivered the project end to end from the first site walk through final commissioning, engineering a 100.44 kW DC roof mounted PV system that offsets peak daytime loads and cuts long term operating costs.
Project Journey
From assessment to activation
Sunshine Renewable Solutions managed the comprehensive project scope, including site design, engineering, permitting, procurement, electrical work, structural work, inspections, and commissioning. Documentation for the project, including engineered plans, site photos, and major equipment data sheets, has been tracked via the project checklist.
-
01
Site Survey
Roof condition, electrical service, and shading were evaluated to confirm the site was ready for solar.
-
02
System Design
A custom array layout was created to maximize production while respecting roof structure and utility requirements.
-
03
Engineering
Structural and electrical calculations were completed to support a safe, code compliant installation.
-
04
Permitting
Plans were submitted to the local authority and utility for approval before construction could begin.
-
05
Procurement
Modules, inverters, racking, and balance of system materials were ordered and staged for the project schedule.
-
06
Electrical
DC wiring, inverter connections, and AC interconnection were installed per the engineered drawings.
-
07
Structural
Roof attachments and racking were secured to with stand wind loads and maintain roof integrity.
-
08
Inspections
Local and utility inspectors verified code compliance, labeling, and system safety before activation.
-
09
Commissioning
The system was powered on, tested, and connected to monitoring to begin delivering clean energy.
Project Gallery
Project Gallery
Project Documents
Download the project files
Explore the full commercial proposal, stamped permitting plans, and the pre installation utility bills that shaped this system's design.
Project Specifications
System details
Planning for Solar or Battery Backup?
Whether you’re a small business owner, a manager of an industrial facility, or a general contractor looking for a specialized EPC partner, we’re here to bring your project to life.